Oro Coatings
Untitled Document
Learn how Oro can contribute up to 8 LEED credits on your next green building or LEED certified project.
Untitled Document
  Oro System Installation Instructions Dealers and Distribution Contact Us   Architects Informaition Approved Installers
The Oro System


Step 1: Apply Oro Base and press the mesh into the base application. Coat over the mesh with Oro Base. Ensure the mesh does not show through the base coat
when it has dried.
Step 2: Once Oro Base is completely dry, roll or spray Oro Primer evenly over the entire surface. Oro Primer has properties that insure color consistencey and stops moisture wicking. Step 3: Trowl or spray Oro TopCoat evenly and consistently. See the illustration below. Please read complete instructions before beginning an install.
Oro Product Example
ICF installation drawing

Untitled Document
© 2008, Oro International, All Rights Reserved - info@orocoatings.com - 888.676.2683